|
||
|
|
|
27 JAN |
REZ-LOK (SINCLAIR) DUPLEXER INSTALLED |
VE3CPK |
|
LOSS OF RX SENSITIVITY T.O.S. 900 PM. RX CHECKED, 640 uf REPLACED IN POWER SUPPLY. CONNECTING CABLES CHECKED. BACK IN SERVICE 1.30 PM 12 MAY |
VE3CPK |
|
C.O.R. NOT TRIGGERING, TAKEN OFF AIR & COR REMOVED FOR BENCH TESTING |
|
|
Q2 HIGH LEAKAGE, REPLACED. COLLECTOR RESISTOR Q2 CHANGED FROM 330 ohm TO 1 Kohm TO REDUCE CURRENT DRAIN BACK IN SERVICE 10.00 PM |
VE3CPK |
Previous Year |
1971 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 |
Next Year |